Industries · Oil & Gas

Reclaiming well pads, pipelines, and lease roads across the field.

From spud to surface reclamation, KerTec restores land disturbed by drilling and midstream construction matched to the compacted.

The Challenge

Well pads and rights-of-way present a
distinct set ofrestoration challenges.

01

Well Pad & Pipeline Disturbance

Drilling pads, access roads, and
pipeline rights-of-way strip vegetation
and expose bare soil across large,
often irregular footprints.

02

Compacted, Saline Soils

Heavy equipment traffic and
produced-water exposure can
compact and salt soils, making
standard seed mixes and mulches
ineffective.

03

Surface Reclamation Requirements

Operators need documented,
defensible reclamation work to satisfy
landowner agreements and regulatory
closure requirements.

How KerTec Serve oil & gasIndustry.

We draw on the same services used across every KerTec project, applied to the specific demands of the field:


01

Erosion Control

Stabilizing disturbed pad edges, access roads, and pipeline corridors to prevent runoff and topsoil loss before revegetation begins.


02

Revegetation

Native seed mixes selected for compacted and saline soils, matched to the surrounding rangeland so restored areas blend back into the landscape.


03

SWPPP Compliance

Installation, inspection, and reporting on stormwater controls throughout construction and post-construction phases.


04

Consulting

Site-specific reclamation planning that accounts for lease terms, landowner expectations, and regional regulatory standards.


Have a well pad or pipeline project
that needs reclamation?

The KerTec Difference

Why operators work with KerTec.


Field-tested in West Texas conditions

Decades of combined experience working the caliche and rangeland soils common across regional oil and gas leases.


Crews that travel to the site

KerTec mobilizes to well pads and lease roads wherever the project is located, not just near our home base.


One point of contact, start to finish

From initial consulting through final revegetation sign-off, a single KerTec team manages the project.


Documentation built for compliance

Clear records of erosion control and SWPPP work to support landowner and regulatory reporting requirements.

Capabilities

SCIENCE-BASED
SOLUTIONS

01

Consulting

Industry experience, design-build, or fully customized science-based environmental solutions for projects anywhere in the country.

Design-build

Compliance strategy

02

Erosion Control

Permanent stabilization of topsoil, with measures tailored specifically to slope, soil and rainfall at the site.

Blankets & wattles

Slope stabilization

03

Revegetation

Native seed expertise applied to the project site, climate and region to meet or exceed the client’s establishment goals.

Native mixes

PLS specification

04

Hydroseeding

Erosion control and revegetation accomplished simultaneously, with the application customized to the site and the budget.

Mulch tackifier

Single-pass

05

SWPPP Compliance

Qualified natural resource professionals to install, inspect, monitor, repair and report throughout the life of the project.

Inspections

Reporting

06

Vegetation Management

Customized plans, mowing and spraying programs, robotic mowing and grazing — built for solar farms and linear corridors.

Robotic mowing

Grazing

Consultation

Send us the site.
We'll send back a plan.

Acreage, ecoregion, permit deadlines and success criteria that is all
we need to scope a prescription and a schedule.