SWPPP Compliance & Inspection Services
Stay ahead of stormwater compliance requirements with SWPPP inspections, monitoring, BMP maintenance, corrective actions, and reporting built around your project site. From active construction areas to energy and federal projects, our team helps keep erosion and sediment controls working properly and documented throughout the job.
How KerTec Can Help
SWPPP Inspections, Monitoring & Reporting
Keeping a project compliant with its Stormwater Pollution Prevention Plan requires regular field inspections, clear documentation, and quick attention to any erosion or sediment control issues that develop on site.
SWPPP inspections review disturbed areas, drainage paths, discharge points, stabilized entrances, sediment controls, erosion control BMPs, and other areas where stormwater runoff could create a compliance problem. Site conditions can change quickly during active construction, so monitoring helps identify damaged controls, exposed soil, sediment buildup, or areas that need maintenance before they become larger issues.
Inspection findings should also be properly documented, including site observations, BMP conditions, maintenance needs, corrective actions, repairs, and changes in site conditions. Consistent reporting provides a clear record of how stormwater controls are being maintained throughout the project.


What KerTec Does
BMP Installation, Maintenance & Corrective Action
Stormwater BMPs need to stay functional throughout the life of a project, especially as grading, weather, and construction activity change site conditions. Damaged or poorly maintained controls can lead to sediment movement, erosion, runoff issues, and avoidable compliance problems.
Services can include the installation, maintenance, and repair of erosion and sediment control BMPs such as silt fencing, sediment barriers, stabilized entrances, inlet protection, slope stabilization measures, and temporary or permanent ground cover.
If an inspection identifies a problem, corrective action can be taken to repair failed controls, address exposed soil, remove sediment buildup, or install additional protection where needed. Keeping these measures maintained and properly documented helps reduce stormwater risk and keeps the site in better shape as work progresses.
How KerTec Can Help
SWPPP Compliance for Construction & Energy Projects
Construction and energy projects often disturb large areas of soil, creating more opportunities for erosion, sediment movement, and stormwater runoff. SWPPP compliance helps keep those risks under control throughout clearing, grading, excavation, installation, and final site stabilization.
Support can be provided for commercial construction, solar and wind developments, oil and gas infrastructure, and federal projects where erosion and sediment controls need to be installed, inspected, maintained, and documented. Each site is reviewed based on its terrain, drainage patterns, disturbed areas, project activity, and environmental requirements.
As work progresses, controls may need to be adjusted to match changing conditions on the ground. Regular inspections and maintenance help keep BMPs effective, reduce compliance issues, and support a smoother path toward final stabilization and revegetation.

Keep Your Project's Stormwater Controls Maintained & Documented.
The KerTec Difference
Why contractors work with KerTec.
Responsive to changing site conditions
Erosion control adjusted as grading progresses and site conditions shift throughout the project.
Inspection-ready documentation
Clear SWPPP records that hold up to regulatory inspection and reduce the risk of violations.
Coordinated with your schedule
KerTec works around active grading and construction crews instead of creating bottlenecks.
Stabilization through final closeout